Election Day, October 26, 2026

I grew up in Hamilton. My father worked in a steel factory, my mother at Tim Horton's. They built a good life on two working incomes during a time when that was still possible.
School was a struggle. I was a slow reader and didn't like being there. It took my Grade 4 teacher giving me extra support and encouragement to set me up to succeed, something I've never forgotten.
I came to London on my own for university and stayed. Over twenty years now. I went to Montcalm Secondary School here in Ward 3, studied at King's University College, and built a career, a family, and a life in London.
What drives me to run is simple. The life my parents built for us isn't available to the next generation, not in London, not in most of this country. That's not just a policy problem. It's a fairness problem. And I think more than just housing can be fixed if we're willing to do the work.
I hold a Master's in Clinical Mental Health Counselling and am currently completing my MBA. I have worked as a counsellor and student affairs administrator, spending years working with young people, families, and folks falling through the cracks.
These experiences have shaped how I look at every issue on this platform.
I've served on committees with the City of London and, most recently, as a Thames Valley District School Board trustee. That last chapter is a longer story. I've written about it honestly on a separate page. Read: What I Learned at the School Board →
My positions and work have been covered by the London Free Press, CBC London, and local radio going back over a decade. See media coverage →
2022 - Present
Elected to represent Wards 2–6. I pushed for transparency, asked the hard questions, and held the system accountable. My counselling background gave me a different lens at the board table: focused on the whole child, not just the policy.
2010 - Present
Community involvement has always been hands-on. I've volunteered as a crisis phone responder, coached Timmie soccer, served on the Supervised Alternative Learning Committee with TVDSB, and held past Vice-Chair roles with Block Parents of London and the City of London's Diversity, Inclusion and Anti-Oppression Advisory Committee, and served as a past condo board member (President & Member at Large).
2005 - Present
Years in management and operations taught me that good intentions mean nothing without follow-through. And follow-through means nothing unless it creates lasting impact.




Ward 3 City Council platform priorities for London Ontario. Leroy Osbourne's policies cover Ward 3 housing policy, London Ontario transit solutions, and infrastructure maintenance. Leroy Osbourne Ward 3 platform for the 2026 municipal election.
Data centres are coming to Ontario. The provincial government has made that clear. The provincial government has also made clear that it has the power to override municipal moratoriums when it wants to. Oakville, Hamilton, and Mississauga are examples of this.
City Council has the responsibility to protect the interests of London and Londoners to make sure any data centre project meets legally binding requirements that are tied to project approval and operation of the site.
My position is that no data centre application moves forward in London without meeting all of the following written into the site plan agreement:
This is the only path forward that protects London against the agenda of the province.
A resident in Old South solved a road safety concern in months that the city could not resolve in years. A $375 AI sensor captured what one manual count missed. Council approved the 4-way stop. Residents should not have to arrive at the solution themselves.
When someone raises a concern about their street there should be a transparent process to address the concern. The current system is not working. Manual counts taken in winter or on rain days are being used to evaluate complaints.
The process needs to be easier for residents to request safety measures to be added to their neighbourhood and to have calming measures that were added years and decades ago to be audited for their current effectiveness.
The city already has the data from police and other emergency services about accidents and resident complaints. This aggregated data should be used to proactively address road safety concerns. Action cannot be solely based upon traffic volume.
In general, manual counts need to stop being used as the means of data collection.
Ontario's Road Safety Infrastructure Fund covers speed cushions, raised crosswalks, and radar speed signs in school and community safety zones. London's initial share is $1.29 million. Federal active transportation funding covers bollards and bump-outs. It requires someone at Council making sure London is applying these measures proactively or with more urgency when residents identify the issue.
London adopted a Climate Emergency Action Plan in 2022.
The implementation gap is visible. Ward 3's newer northern neighbourhoods have significantly less tree canopy than older parts of the city. London averaged 27 percent coverage citywide and was named Forest Capital of Canada this year, but the distribution is uneven. Meanwhile, downtown London has potted plants on its main streets instead of trees. To be serious about the urban heat island effect, we need permanent trees in the downtown core, not seasonal planters, so people can actually use these spaces again.

London builds parks. It does not always design destinations. A park for adults is not a park with benches around a field. It is a space people choose to spend time in, with pathways that draw you in, trees that create shade and atmosphere, and a design that makes the space feel like an oasis within the city.
A circular basketball court designed into a naturalized landscape serves three times the players on the same footprint and creates a space worth watching from the outside too.

A naturalized playground built from boulders, logs, earthforms, and native plantings creates a richer sensory experience than a manufactured structure, costs less to maintain over fifteen years, and gives children something they cannot get from a metal slide.

As a school board trustee I watched schools struggle to replace aging playground equipment. A typical mid-size municipal playground installation runs $75,000 to $150,000. Most of them are just a place, not a destination or an experience. There are better ways to design these spaces, cost effectively.
A uniquely designed splash pad with a dual-use surface becomes a community gathering point in summer and a skating surface in winter. One installation. Two seasons. A destination rather than a concrete pad sitting empty half the year.
Ward 3 has business potential the City has not fully developed. The London International Airport sits in our ward with over 1,000 acres of development-ready land, 50 businesses already on site, and $623 million in annual economic impact.
The VW battery gigafactory 30 kilometres south of us in St. Thomas starts production in 2027, with 3,000 direct jobs and an estimated 30,000 spillover jobs across the region.
City Council approved an Aerospace Innovation Corridor near the airport as part of the 2026 to 2030 Economic Development Strategy.
Small businesses across London get hit hard when road construction happens. The current support from the City is ineffective. When a street tears up the road to the front door of a business, the business loses months of revenue. Toronto's construction mitigation program pays affected businesses directly and is predominantly funded by senior levels of government. It is unclear whether London has pursued that funding.
Ward 3 does not currently have a Business Improvement Area.
In 2023, 44 percent of Torontonians in their 20s said they felt lonely at least three days a week. For those 30 and older, it was 31 percent.
London may not be that far off. We have all re-evaluated our connections to each other and the world since the pandemic.
In general, we do events well here in London. Sunfest, Home County, and Rock the Park all bring thousands out. But going to an event is not the same as connecting with someone new.
As a residence life manager at King's University College, my job was creating the conditions for people to find their fit, not just running programming. This is work London can do too if we want to grow the city, make people proud of where they live, and be happy they live here.
Wellington under construction. Oxford in front of Fanshawe, under construction. Highbury Ave, under construction. All the major arteries torn up at the same time. A traffic nightmare, and the same collective frustration every year: can this be done differently, better, and not all at once?
Because nothing stops it. Utilities like Bell, Rogers, Enbridge, and London Hydro pay a pavement degradation fee when they cut into city roads. The fee just makes them pay. The process doesn't take into account the experience of Londoners.
London has a Utility Coordinating Committee that meets with the major utilities to schedule road work. Its decisions aren't public. Residents can't see what's coming to their street until the cones show up.
London's road construction contract sets a penalty for a contractor finishing late at only $1,000 per calendar day. The contract also charges the contractor cost recovery for city staff time still on site during the delay. On a $10 million project, two months late costs the contractor $60,000 in actual penalty. Their idle equipment costs them more than that in a week. The penalty exists, but it doesn't ensure timely completion of the road.